Mumbai: More than 163 million Indians--more than the population of Russia--do not have access to safe drinking water, and the national rural drinking water programme, despite spending 90% of Rs 89,956 crore over five years to 2017, has “failed” its targets, according to an August 2018 report from the government’s auditor.
The programme’s target: Providing 35% of rural households with water connections and 40 lt--about two buckets--of water per person per day. Less than half that target was achieved, thanks to “poor execution” and “weak contract management”, said the audit report from the Comptroller and Auditor General (CAG).
About 78% of 1.7 million rural Indian habitations have access to the minimum required quantity of water, 40 lt--roughly two buckets of water--per person per day, but that does not mean they actually get this water, experts said. Nearly 18% of rural habitations get less than 40 lt per person per day under the National Rural Drinking Water Programme (NRDWP), according to a July 2018 government response to Parliament.
NRDWP is a centrally sponsored scheme aimed at providing every person in rural India with “adequate, safe water” for drinking, cooking and other domestic basic needs in a “sustainable manner”, according to the ministry of drinking water and sanitation website. The scheme provides financial and technical assistance to state governments to install rural drinking water connections.
Source: Lok Sabha (Unstarred question no.450)]
Note: ‘Fully covered habitations’ receive at least 40 lt of water per person per day. ‘Partially covered habitations’ receive less than 40 lt per person per day
The “coverage of rural habitations increased by only 8% at 40 lpcd (litres per capita per day or water available per person) and 5.5% on the basis of 55 lpcd during 2012-17 despite the expenditure of Rs 81,168 crore”, noted the CAG performance audit of the NRDWP.
Although India has improved access to water quicker than any other nation, there are more Indians without access to safe water than any other country, IndiaSpend reported on March 21, 2018.
Nearly 163 million people lack access to clean water close to their homes in India--which is more than two-and-a-half times the number in Ethiopia, second in the list of countries with people without access to safe water.
Targets missed despite spending Rs 81,168 crore
“The interim goal till 2017 was to cover 50% of all rural households with piped water supply which has been achieved,” noted a August 2017 government response to Parliament. “By 2022, the goal is to cover 90% rural households with piped water supply.”
The target was to provide all rural habitations, government schools and anganwadis (government-run daycare centres) access to safe drinking water, 50% of the rural population with potable drinking water (55 lpcd) by piped water supply, and 35% of rural households with household connections.
The 55 lpcd target for half the rural population was to be provided within the “household premises or at a horizontal or vertical distance of not more than 100 m” without “barriers of social or financial discrimination”, said a 2013 NRDWP guideline.
One of the goals of the ministry of drinking water and sanitation’s 2011-2022 strategic plan was that every rural Indian would have access to 70 lpcd within his or her household premises or at a horizontal or vertical distance of not more than 50 m.
“As of December 2017, only 44% of rural habitations and 85% of government schools and anganwadis could be provided access to safe drinking water, only 18% of rural population provided potable drinking water by piped water supply and only 17% of rural households were provided household connections,” said the CAG report.
The proportion of rural habitations with safe drinking water increased by no more than 8% at 40 lpcd and 5.5% at 55 lpcd after spending Rs 81,168 crore during the period 2012-17; 90% of Rs 89,956 crore (central share of Rs 43,691 crore and state share of Rs 46,265 crore) provided for the programme was spent over this period, the CAG report said. The highest expenditure (84%) was in 2014-15.
The report identified “poor execution of works” and “weak contract management” for water-supply projects remaining “incomplete, abandoned and non-operational works, unproductive expenditure on equipment, non-functional sustainability structures and gaps in contract management that had a total financial implication of Rs 2,212.44 crore”.
“Recently, the NRDWP has been restructured towards improving efficiency,” Parameswaran Iyer, secretary, ministry of drinking water and sanitation, told IndiaSpend in an interview published on October 5, 2018. “The NRDWP reforms have moved the programme towards effective implementation, stronger monitoring mechanism, and competitive and challenge mode funding [providing financial contributions to achieve social outcomes to be delivered by the private sector].”
Rs 23,050 crore has been approved for the programme over two years to 2020 after the union cabinet approved the NRDWP restructuring, said a November 2017 government press release.
While the government is restructuring the programme, experts said it may still be hard to meet targets.
Access alone is not enough
There is “increasing concern” that access does not translate to availability, Veena Srinivasan, fellow at the Ashoka Trust for Research in Ecology and the Environment, an advocacy, told IndiaSpend. “I agree with the point made in the CAG’s report. In general, spending on independent monitoring and evaluation is very low and monitoring and evaluation budgets are rarely spent.”
“As per the government, the current coverage of households through piped water supply is only 17%,” VK Madhavan, chief executive of WaterAid India, an NGO, told IndiaSpend. “This is going to be a huge challenge. Irrespective of the source of water, in most parts of rural India, availability of water decreases dramatically in the summer months as the water levels drop and surface sources may dry up.”
India’s estimated per capita availability of water in 2025 will be 1,341 cubic metre (cu.m). This may further fall to 1,140 cu.m in 2050, bringing it closer to becoming water-scarce, according to a 2017 assessment by the ministry of water resources, IndiaSpend reported on December 30, 2017. Over the decade ending 2011, water availability reduced by 15% in India.
The data shared by the government “greatly obscure” the “dry pipe problem”--a reference to non availability of water despite the existence of an asset--and especially the seasonality, in that many villages depend on tankers, said Srinivasan.
Experts said India needed to look beyond the quantity of water to quality and reliability as well.
“Unless we look at quality, quantity, access and reliability as a measure for water security, it will only be about creating assets,” Karthik Seshan, Manager-WATSAN Programme, Arghyam, a philanthropy, told IndiaSpend.
The data on the government’s information system do not, often, reflect reality, said Seshan.
“For example, we have found that arsenic contamination in some areas of Paschim Champaran district [in north western Bihar], where we have done some research, is much higher than the prescribed standard of 10 parts per billion (ppb); in some cases as high as 397 ppb (Khap Tola in Paschim Champaran),” said Seshan. “But in IMIS (integrated management information system), these regions are not even identified as arsenic affected.”
There are 69,258 “water-quality-affected habitations”, home to nearly 46 million people--equivalent to the population of Odisha--according to government data.
Source: Lok Sabha (Unstarred question no.450)
“Our infrastructure to test for water quality is abysmal,” said Madhavan of Water Aid. “Most district labs are faced with shortages of equipment and people.”
The National Water Quality Sub-Mission, started by the drinking-water ministry in February 2017, will address the “urgent need” for clean drinking water in about 28,000 arsenic- and fluoride-affected identified habitations. The Centre will need to contribute about Rs 12,500 crore over four years t0 March 2021, noted the November 2017 government press release.